Engineering Oklahoma’s rural infrastructure, from planning and funding through construction.
Water and wastewater systems, streets and drainage, survey and funding for communities that carry the same regulatory burden as a city with a fraction of the staff. We serve as the standing engineer for 21 districts, cities and towns across the state.
21
Districts, cities and towns where we hold a standing engineering appointment
$31 million
Combined construction value of the representative projects listed here
In house
Survey crews and construction inspection, so schedules do not wait on a subconsultant
What we do
Six capability areas. Most of our work touches several of them on the same project, which is the point: one firm carries a system from the study that justifies it to the inspection that closes it out.
-
Municipal water and wastewater
Treatment, storage, distribution and collection for systems serving a few hundred to a few thousand people.
-
Hydraulic analysis and system planning
Knowing what the system will do before anyone puts a shovel in the ground.
-
Streets, drainage and civil site development
Roadways, stormwater and the ground work under commercial and residential projects.
-
Surveying and mapping
In house crews, so the survey is not the thing holding up the schedule.
-
Funding, permitting and regulatory assistance
The paperwork between a needed project and a funded one.
-
Construction administration and inspection
The same people who drew it are the ones who watch it get built.
Representative work
Costs are construction value. Where a project was delivered by Aaron Mears at a previous firm, it says so.
| Project | Community | Capability | Construction value |
|---|---|---|---|
| 0.5 MGD wastewater treatment plant prior firm | Pawnee | Municipal water and wastewater | $6.7 million |
| 1.5 MGD water treatment plant rehabilitation | Town of Talihina | Municipal water and wastewater | $5.3 million |
| Water system analysis and improvements | City of Lone Grove | Hydraulic analysis and system planning | $4.3 million |
| Sewer line improvements, 6.8 miles prior firm | City of Guthrie | Municipal water and wastewater | $3.8 million |
| Water system improvements, 13.6 miles prior firm | Flint Ridge | Municipal water and wastewater | $2.1 million |
| Water system analysis and improvements prior firm | Pawnee RWD 5 | Hydraulic analysis and system planning | $1.8 million |
| Wastewater lagoon rehabilitation prior firm | Laverne | Municipal water and wastewater | $1.3 million |
| 0.25 MG storage tank prior firm | Seminole | Municipal water and wastewater | $1.2 million |
Tell us what the system is doing.
A consent order, a failed sanitary survey, a tank that will not hold pressure, or a funding window that closes next month. Start there and we will tell you what it takes.