Scope
Design and construction administration of a 0.25 million gallon storage tank.
Outcome
Added storage and system pressure stability for the served area.
This project was delivered by Aaron Mears, P.E. while at a previous firm. It is listed because the experience is his, not because it was performed by Mears Engineers.
Tell us what the system is doing.
A consent order, a failed sanitary survey, a tank that will not hold pressure, or a funding window that closes next month. Start there.