Scope
Design and construction administration of a new 0.5 million gallon per day mechanical wastewater treatment plant replacing an aging facility.
Outcome
Replaced a facility that could no longer meet permit limits with one sized for the community's actual load and its next several decades.
This project was delivered by Aaron Mears, P.E. while at a previous firm. It is listed because the experience is his, not because it was performed by Mears Engineers.
Tell us what the system is doing.
A consent order, a failed sanitary survey, a tank that will not hold pressure, or a funding window that closes next month. Start there.