Scope
Rehabilitation of an existing 0.25 million gallon storage tank.
Outcome
Extended the service life of existing storage rather than replacing it.
This project was delivered by Aaron Mears, P.E. while at a previous firm. It is listed because the experience is his, not because it was performed by Mears Engineers.
Tell us what the system is doing.
A consent order, a failed sanitary survey, a tank that will not hold pressure, or a funding window that closes next month. Start there.